Gymnasium Curtain Maintenance and Repair Checklist

  • Inspect motor drive units
  • Adjust limits as necessary
  • Align cable spools to pull up direct and plumb
  • Inspect cable system. Install new cable where required at an additional cost of $1.00 per foot of cable used.
  • Inspect all main support tubular steel
  • Inspect and tighten U clamps, C clamps, and joist hangers
  • Check and adjust all deployment for proper movement
  • Inspect relays and record corresponding voltage
  • Check and secure top and bottom battens